DOĞDULAR
DOĞALGAZ VE YAPI
mng

 

NEW DESTINATION CHECKLIST

This Checklist is intended to enable prompt identification of the sources of possible operational risks so as to allow the consideration of any measures for their mitigation. During the assessment it is important to assess the airport itself independent from the flight route. / Bu Kontrol Listesi, olası önlemlerin dikkate alınabilmesi için, operasyonel risk kaynaklarının hızlı bir şekilde tanımlanmasını sağlamayı amaçlamaktadır. Değerlendirme yapılırken uçuş rotasından bağımsız olarak meydanın kendisinin değerlendirilmesi önemlidir.

Airport Name

 

IATA

 

ICAO

 

Country

 

City

 

Operation Start Date

 

Checklist Completion Deadline

 

Date of Completion

Flight Operations Control Dept.

Performance

Department

Flight Operations Director

Ground Operations Department

Technical Department

Fuel Contract Manager

Security Department

Quality & Safety Department

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FLIGHT OPERATIONS

FLIGHT OPERATIONS CONTROL DEPARTMENT

Reference document

 

Aerodrome Type

 

Fire Fighting & Rescue Category

 

Aerodrome Category

 

Runway Length ≥ 6500 ft

                ⃝      YES                               ⃝     NO

Runway Width ≥ 45 m

                ⃝      YES                               ⃝     NO

Pavement Strength Compatible

                ⃝      YES                               ⃝     NO

Take-Off / Destination Alternate Aerodromes

 

Remarks and Additional Info

 

 

 

 

FLIGHT OPERATIONS PERFORMANCE DEPARTMENT

Is the Analysis of Runway(s) Suitable for Operation of Related Aircraft Types?

A300-600

                ⃝      YES                               ⃝     NO

A330

                ⃝      YES                               ⃝     NO

Remarks and Additional Info

 

FLIGHT OPERATIONS DIRECTOR

Approval of Flight Operations Department

                ⃝     It is evaluated as adequate according to the information above.

Remarks and Additional Info

 

 

 

 

GROUND OPERATIONS

RAMP HANDLING OPERATIONS DEPARTMENT

Ramp Handling Availability

 

Suitable high loader

                ⃝      YES                               ⃝     NO

Push back

                ⃝      YES                               ⃝     NO

Tow bar

                ⃝      YES                               ⃝     NO

De/anti icing

                ⃝      YES                               ⃝     NO

Pallet Dollys

                ⃝      YES                               ⃝     NO

Air Starter Unit

                ⃝      YES                               ⃝     NO

Air Condition Unit

                ⃝      YES                               ⃝     NO

Ground Power Unit

                ⃝      YES                               ⃝     NO

Remarks and Additional Info

 

CARGO HANDLING OPERATIONS DEPARTMENT

Cargo Handling Availability

 

Online Warehouse

                ⃝      YES                               ⃝     NO

DG handling and Storage

                ⃝      YES                               ⃝     NO

Perishable Storage

                ⃝      YES                               ⃝     NO

Forklift

                ⃝      YES                               ⃝     NO

ULD Build-up and Breakdown

                ⃝      YES                               ⃝     NO

Cargo (EDI) System

                ⃝      YES                               ⃝     NO

Remarks and Additional Info

 

GROUND OPERATIONS DIRECTOR

Approval of Ground Operations Department

                ⃝     It is evaluated as adequate according to the information above.

Remarks and Additional Info

 

TECHNICAL DEPARTMENT

Aircraft line maintenance service availability

A300-600

                ⃝      YES                               ⃝     NO

A330

                ⃝      YES                               ⃝     NO

Remarks and Additional Info

 

FUEL CONTRACT MANAGER

Review fuel supply arrangements and any possible fuel quality issues

                ⃝     Available                       ⃝     Not Available 

Remarks and Additional Info

 

SECURITY DEPARTMENT

Security Risk Assessment Completed

                ⃝      YES                               ⃝     NO

ACC3 Requirement

                ⃝      YES                               ⃝     NO

Remarks and Additional Info

 

QUALITY AND SAFETY DEPARTMENT

Quality and Safety Department Comments

 

Results of the Safety Risk

                ⃝     Acceptable                    ⃝     Tolerable                       ⃝     Intolerable

                 

 

Site Haritası       Ana Sayfa           Kurumsal           Ürünler           Galeri           Blog           Talep Formu           İletişim